For citations:
Lebedeva A.E., Karakozova I.V. Application of the kanban method to the analysis of project flow in a large contracting organization of the construction sector. Construction: Science and Education. 2024;14(2):178-194. (In Russ.) https://doi.org/10.22227/2305-5502.2024.2.178-194